Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | France | EU CRMA strategic projects · CC BY 4.0, verified 2026-10-24 · checked 24 Oct 2026 |
| Commodities | lithium | EU CRMA strategic projects · CC BY 4.0, verified 2026-10-24 · checked 24 Oct 2026 |
| Owner | Eramet | EU CRMA strategic projects · CC BY 4.0, verified 2026-10-24 · checked 24 Oct 2026 |
| Crma stage | Processing | EU CRMA strategic projects · CC BY 4.0, verified 2026-10-24 · checked 24 Oct 2026 |
| Crma stage | Extraction | EU CRMA strategic projects · CC BY 4.0, verified 2026-10-24 · checked 24 Oct 2026 |
| Crma selected | 25 Mar 2025 (decision: C(2025) 1904, round: 1, scope: eu) | EU CRMA strategic projects · CC BY 4.0, verified 2026-10-24 · checked 24 Oct 2026 |
| Coordinates | 48.9353, 7.8653 | EU CRMA strategic projects · CC BY 4.0, verified 2026-10-24 · checked 24 Oct 2026 |
Know more about this mine, or want an introduction to its owner? Ask us.
Nearby
Within 50 km of this mine: 25 power plants (13 operating, 339 MW) and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| RKI Iffezheim | Power plant | 147 MW | Operating | 21 km |
| Viridian Lithium | Processing plant | — | — | 23 km |
| Windpark Freckenfeld | Power plant | 19.8 MW | Operating | 24 km |
| Minfeld R | Power plant | 12 MW | Operating | 27 km |
Owner and place
Other mines in France
Data on this page
- EU CRMA strategic projects. EU CRMA strategic projects, CC BY 4.0, verified 2026-10-24.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.