Grid connection · Botetourt County, Virginia, United States
Low Moor - Lexington 230 kV grid connection (PJM C01-1232)
Low Moor - Lexington 230 kV grid connection (PJM C01-1232) is a planned grid connection in Botetourt County, Virginia, United States, with 32 MW of capacity, held by Rocky Forge Wind, LLC.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Botetourt County (connects at Low Moor - Lexington 230 kV) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Status | Planned (active, cluster C01 Phase 1) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Holder | Rocky Forge Wind, LLC | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Capacity | 32 MW | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Technology | Wind (registered as Wind) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Grid operator | PJM Interconnection, L.L.C. | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Queue date | 27 Apr 2026 | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Connection date | 1 Apr 2026 (proposed) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Low Moor - Lexington 230 kV grid connection (PJM C01-1232) is the 304th-largest of 415 grid connections in Virginia and the 3,220th-largest of 3,711 in the United States by capacity; its 32 MW is <0.1% of the 833,233 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Virginia | 304th of 415 | 62,531 MW | <0.1% |
| United States | 3,220th of 3,711 | 833,233 MW | <0.1% |
| All grid connections in our data | 4,525th of 7,616 | 1,281,251 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Connected
- Entered the connection queue
Holder, grid operator and place
Other grid connections in Virginia
- Joshua Falls 765 kV grid connection (PJM C01-1390)2,300 MW
- Cunningham - Elmont 500 kV grid connection (PJM C01-1111)1,694 MW
- Cunningham - Elmont 500 kV grid connection (PJM C01-1112)1,694 MW
- Bristers 500 kV grid connection (PJM C01-1884)1,000 MW
- CVOW 2, OSS 2 – T2G07 grid connection (PJM AF1-124 - moved to TC1)836 MW
- CVOW 2, OSS 2 – T2G07 grid connection (PJM AF1-124)836 MW
- CVOW 1, OSS 1 - T1L11 grid connection (PJM AF1-123 - moved to TC1)833 MW
- CVOW 1, OSS 1 - T1L11 grid connection (PJM AF1-123)833 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.