Grid connection · Reeves County, Texas, United States

Tolivar Power Plant (TEF- Due Diligence) grid connection (ERCOT 27INR0297)

Tolivar Power Plant (TEF- Due Diligence) grid connection (ERCOT 27INR0297) is a planned grid connection in Reeves County, Texas, United States, with 225 MW of capacity, held by Pecos Power Plant, LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationReeves County (connects at Tap 138 KV 38045 IH20-38043 Cowpen)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study completed, interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderPecos Power Plant, LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity225 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyNatural gasERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date1 Jul 2024ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date11 Jun 2027 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Tolivar Power Plant (TEF- Due Diligence) grid connection (ERCOT 27INR0297) is the 629th-largest of 1,710 grid connections in Texas and the 1,279th-largest of 4,021 in the United States by capacity; its 225 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas629th of 1,710438,874 MW<0.1%
United States1,279th of 4,021923,876 MW<0.1%
All grid connections in our data1,600th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect

Holder, grid operator and place

More from Pecos Power Plant, LLC

Other grid connections in Texas

All 1874 grid connections in Texas, United States

Data on this page