Grid connection · San Patricio County, Texas, United States

Titus Low Carbon Ventures Solar 1 grid connection (ERCOT 26INR0211)

Titus Low Carbon Ventures Solar 1 grid connection (ERCOT 26INR0211) is a planned grid connection in San Patricio County, Texas, United States, with 338 MW of capacity, held by Vaquero Solar, LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSan Patricio County (connects at Tap 345kV 8249 Angstrom - 8624 Grissom)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study started, interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderVaquero Solar, LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity338 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologySolarERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date13 Oct 2023ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date16 Oct 2028 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Titus Low Carbon Ventures Solar 1 grid connection (ERCOT 26INR0211) is the 318th-largest of 1,710 grid connections in Texas and the 701st-largest of 4,021 in the United States by capacity; its 338 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas318th of 1,710438,874 MW<0.1%
United States701st of 4,021923,876 MW<0.1%
All grid connections in our data1,006th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect

Holder, grid operator and place

Other grid connections in Texas

All 1874 grid connections in Texas, United States

Data on this page