Grid connection · Nueces County, Texas, United States

Sunscape Renewable Energy Solar SLF grid connection (ERCOT 27INR0047)

Sunscape Renewable Energy Solar SLF grid connection (ERCOT 27INR0047) is a planned grid connection in Nueces County, Texas, United States, with 523 MW of capacity, held by Sunscape Renewable Energy LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNueces County (connects at Bus# 8455 Lon C Hill to Bus# 80078 Reforzar 345 kV Line)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study started, interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderSunscape Renewable Energy LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity523 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologySolarERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date28 Jun 2023ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date31 Oct 2028 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Sunscape Renewable Energy Solar SLF grid connection (ERCOT 27INR0047) is the 130th-largest of 1,710 grid connections in Texas and the 297th-largest of 4,021 in the United States by capacity; its 523 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas130th of 1,710438,874 MW0.12%
United States297th of 4,021923,876 MW<0.1%
All grid connections in our data598th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect

Holder, grid operator and place