Grid connection · Bastrop County, Texas, United States

SIM Gideon Gas Rice grid connection (Ercot 31INR0011)

SIM Gideon Gas Rice grid connection (Ercot 31INR0011) is a planned grid connection in Bastrop County, Texas, United States, with 226 MW of capacity, held by LCRA.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceSIM GIDEON GAS RICE grid connection (ERCOT 31INR0011)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
LocationBastrop County (connects at (#7310) SIM Gideon 138 kV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (SS completed, FIS started, IA)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderLCRAERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity226 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyNatural gas (registered as GAS/IC)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date29 Jul 2025ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date10 May 2031 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

SIM Gideon Gas Rice grid connection (Ercot 31INR0011) is the 624th-largest of 1,710 grid connections in Texas and the 1,109th-largest of 3,711 in the United States by capacity; its 226 MW is <0.1% of the 833,233 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas624th of 1,710438,874 MW<0.1%
United States1,109th of 3,711833,233 MW<0.1%
All grid connections in our data1,428th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Holder, grid operator and place

More from LCRA

Other grid connections in Texas

All 1874 grid connections in Texas, United States

Data on this page