Grid connection · Lampasas County, Texas, United States

Solgen Storage grid connection (ERCOT 30INR0038)

Solgen Storage grid connection (ERCOT 30INR0038) is a planned grid connection in Lampasas County, Texas, United States, with 150 MW of capacity, held by Lampasas Hybrid Energy LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationLampasas County (connects at 7066 Adamsville 138kV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study started, no interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderLampasas Hybrid Energy LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity150 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyStorageERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date25 Apr 2025ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date30 Aug 2029 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Solgen Storage grid connection (ERCOT 30INR0038) is the 1,173rd-largest of 1,710 grid connections in Texas and the 2,095th-largest of 4,021 in the United States by capacity; its 150 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas1,173rd of 1,710438,874 MW<0.1%
United States2,095th of 4,021923,876 MW<0.1%
All grid connections in our data2,443rd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect