Grid connection · Denton County, Texas, United States
Oakley BESS grid connection (Ercot 28INR0454)
Oakley BESS grid connection (Ercot 28INR0454) is a planned grid connection in Denton County, Texas, United States, with 201 MW of capacity, held by Oakley BESS LLC.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | Oakley BESS grid connection (ERCOT 28INR0454) | ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026 |
| Location | Denton County (connects at Tap 138 kV 612 Bluhorse– 684 Spring) | ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026 |
| Status | Planned (SS completed, FIS started, no IA) | ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026 |
| Holder | Oakley BESS LLC | ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026 |
| Capacity | 201 MW | ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026 |
| Technology | Storage (registered as OTH/BA) | ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026 |
| Grid operator | Electric Reliability Council of Texas, Inc. | ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026 |
| Queue date | 6 Oct 2025 | ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026 |
| Connection date | 8 Sept 2028 (proposed) | ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Oakley BESS grid connection (Ercot 28INR0454) is the 879th-largest of 1,710 grid connections in Texas and the 1,384th-largest of 3,711 in the United States by capacity; its 201 MW is <0.1% of the 833,233 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Texas | 879th of 1,710 | 438,874 MW | <0.1% |
| United States | 1,384th of 3,711 | 833,233 MW | <0.1% |
| All grid connections in our data | 1,703rd of 7,616 | 1,281,251 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Holder, grid operator and place
More from Oakley BESS LLC
- Oakley BESS200 MW · planned
Other grid connections in Texas
- Brazos Energy Security grid connection (Ercot 28INR0456)3,000 MW
- BM Great Rock Energy Center grid connection (Ercot 30INR0091)1,981 MW
- Prairie Ridge (Gas - CC) grid connection (Ercot 30INR0071)1,660 MW
- Hecate Energy Orem Wind grid connection (Ercot 27INR0061)1,542 MW
- Aegle Power grid connection (Ercot 27INR0084)1,536 MW
- Big Canyon Wind grid connection (Ercot 30INR0018)1,500 MW
- Caldwell County Energy Center grid connection (Ercot 30INR0031)1,500 MW
- Bullock Gas grid connection (Ercot 33INR0005)1,400 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.