Grid connection · Atascosa County, Texas, United States

Amphion Solar Phase 3 grid connection (ERCOT 28INR0344)

Amphion Solar Phase 3 grid connection (ERCOT 28INR0344) is a planned grid connection in Atascosa County, Texas, United States, with 115 MW of capacity, held by Amphion Solar, LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAtascosa County (connects at TAP 345KV (#5709) Fowlerton - (#5901) San Miguel Line Ckt-2)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study started, no interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderAmphion Solar, LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity115 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologySolarERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date21 Apr 2025ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date15 Nov 2029 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Amphion Solar Phase 3 grid connection (ERCOT 28INR0344) is the 1,303rd-largest of 1,710 grid connections in Texas and the 2,483rd-largest of 4,021 in the United States by capacity; its 115 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas1,303rd of 1,710438,874 MW<0.1%
United States2,483rd of 4,021923,876 MW<0.1%
All grid connections in our data2,868th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect

Holder, grid operator and place

More from Amphion Solar, LLC

Other grid connections in Texas

All 1874 grid connections in Texas, United States

Data on this page