Grid connection · Zapata County, Texas, United States

Barrosos Creek Wind 4 grid connection (ERCOT 28INR0338)

Barrosos Creek Wind 4 grid connection (ERCOT 28INR0338) is a planned grid connection in Zapata County, Texas, United States, with 198 MW of capacity, held by Cascabel Wind Energy, LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationZapata County (connects at #80227 Rapido 345 kV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study started, no interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderCascabel Wind Energy, LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity198 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyWindERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date18 Aug 2025ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date31 May 2028 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Barrosos Creek Wind 4 grid connection (ERCOT 28INR0338) is the 976th-largest of 1,710 grid connections in Texas and the 1,841st-largest of 4,021 in the United States by capacity; its 198 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas976th of 1,710438,874 MW<0.1%
United States1,841st of 4,021923,876 MW<0.1%
All grid connections in our data2,175th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect