Grid connection · Falls County, Texas, United States

Fallstone Solar SLF grid connection (ERCOT 28INR0147)

Fallstone Solar SLF grid connection (ERCOT 28INR0147) is a planned grid connection in Falls County, Texas, United States, with 60.6 MW of capacity, held by Fallstone Solar, LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationFalls County (connects at Tap 69kV 3588 Groesbeck - 3637 Otto Junction)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study started, no interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderFallstone Solar, LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity60.6 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologySolarERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date19 Dec 2024ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date21 Sept 2028 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Fallstone Solar SLF grid connection (ERCOT 28INR0147) is the 1,561st-largest of 1,710 grid connections in Texas and the 3,143rd-largest of 4,021 in the United States by capacity; its 60.6 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas1,561st of 1,710438,874 MW<0.1%
United States3,143rd of 4,021923,876 MW<0.1%
All grid connections in our data3,817th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect

Holder, grid operator and place

More from Fallstone Solar, LLC

Other grid connections in Texas

All 1874 grid connections in Texas, United States

Data on this page