Grid connection · Caldwell County, Texas, United States

Demeter Storage 2 grid connection (ERCOT 26INR0523)

Demeter Storage 2 grid connection (ERCOT 26INR0523) is a planned grid connection in Caldwell County, Texas, United States, with 138 MW of capacity, held by Demeter Solar, LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCaldwell County (connects at Tap 138kV 7224 Luling - 7216 Lockhart)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study started, no interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderDemeter Solar, LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity138 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyStorageERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date1 Oct 2024ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date1 Jun 2029 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Demeter Storage 2 grid connection (ERCOT 26INR0523) is the 1,218th-largest of 1,710 grid connections in Texas and the 2,302nd-largest of 4,021 in the United States by capacity; its 138 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas1,218th of 1,710438,874 MW<0.1%
United States2,302nd of 4,021923,876 MW<0.1%
All grid connections in our data2,661st of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect

Holder, grid operator and place

More from Demeter Solar, LLC

Other grid connections in Texas

All 1874 grid connections in Texas, United States