IEP Blackhawk grid connection (ERCOT 25INR0310) is a planned grid connection in Galveston County, Texas, United States, with 100 MW of capacity, held by IEP Texas Verde II, llc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationGalveston County (connects at 38740 Heights Substation 138kV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study started, no interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderIEP Texas Verde II, llcERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity100 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyStorageERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date7 Apr 2023ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date1 Dec 2026 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

IEP Blackhawk grid connection (ERCOT 25INR0310) is the 1,471st-largest of 1,710 grid connections in Texas and the 2,685th-largest of 4,021 in the United States by capacity; its 100 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas1,471st of 1,710438,874 MW<0.1%
United States2,685th of 4,021923,876 MW<0.1%
All grid connections in our data3,100th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect