Goldeneye BESS grid connection (ERCOT 25INR0100) is a planned grid connection in Bell County, Texas, United States, with 202 MW of capacity, held by Black Mountain Energy Storage II.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBell County (connects at 3423 Killeen Switch 138 KV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study completed, interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderBlack Mountain Energy Storage IIERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity202 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyStorageERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date10 Jun 2022ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date15 May 2028 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Goldeneye BESS grid connection (ERCOT 25INR0100) is the 814th-largest of 1,710 grid connections in Texas and the 1,483rd-largest of 4,021 in the United States by capacity; its 202 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas814th of 1,710438,874 MW<0.1%
United States1,483rd of 4,021923,876 MW<0.1%
All grid connections in our data1,804th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.