Grid connection · Atascosa County, Texas, United States

Reis Solar grid connection (ERCOT 25INR0082)

Reis Solar grid connection (ERCOT 25INR0082) is a planned grid connection in Atascosa County, Texas, United States, with 105 MW of capacity, held by Greenalia Solar Power Reis, LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAtascosa County (connects at Tapping into 138 kV line (5689) Choke Canyon AEP to (5902) San Miguel Gen)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study started, no interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderGreenalia Solar Power Reis, LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity105 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologySolarERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date2 Jun 2022ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date3 Aug 2027 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Reis Solar grid connection (ERCOT 25INR0082) is the 1,332nd-largest of 1,710 grid connections in Texas and the 2,536th-largest of 4,021 in the United States by capacity; its 105 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas1,332nd of 1,710438,874 MW<0.1%
United States2,536th of 4,021923,876 MW<0.1%
All grid connections in our data2,936th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect

Holder, grid operator and place

More from Greenalia Solar Power Reis, LLC

Other grid connections in Texas

All 1874 grid connections in Texas, United States

Data on this page