Grid connection · McLennan County, Texas, United States

Albatross BESS grid connection (ERCOT 25INR0071)

Albatross BESS grid connection (ERCOT 25INR0071) is a planned grid connection in McLennan County, Texas, United States, with 50.4 MW of capacity, held by Albatross Solar, LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMcLennan County (connects at From Bus #165 Windsor Switch To Bus #161 McGregor)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study completed, interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderAlbatross Solar, LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity50.4 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyStorageERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date16 May 2022ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date30 Dec 2028 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Albatross BESS grid connection (ERCOT 25INR0071) is the 1,599th-largest of 1,710 grid connections in Texas and the 3,263rd-largest of 4,021 in the United States by capacity; its 50.4 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas1,599th of 1,710438,874 MW<0.1%
United States3,263rd of 4,021923,876 MW<0.1%
All grid connections in our data4,056th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect

Holder, grid operator and place

More from Albatross Solar, LLC

Other grid connections in Texas

All 1874 grid connections in Texas, United States