Grid connection · Houston County, Texas, United States

Camino Ranch Solar SLF grid connection (ERCOT 24INR0412)

Camino Ranch Solar SLF grid connection (ERCOT 24INR0412) is a planned grid connection in Houston County, Texas, United States, with 296 MW of capacity, held by Camino Ranch Solar Project LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHouston County (connects at Tap to Jim English (#3351) – Flat Branch (#3345) 138kV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study completed, interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderCamino Ranch Solar Project LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity296 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologySolarERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date6 Oct 2022ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date9 Dec 2028 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Camino Ranch Solar SLF grid connection (ERCOT 24INR0412) is the 460th-largest of 1,710 grid connections in Texas and the 983rd-largest of 4,021 in the United States by capacity; its 296 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas460th of 1,710438,874 MW<0.1%
United States983rd of 4,021923,876 MW<0.1%
All grid connections in our data1,294th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect

Holder, grid operator and place

More from Camino Ranch Solar Project LLC

Other grid connections in Texas