Grid connection · Lamar County, Texas, United States

MRG Goody Storage grid connection (ERCOT 24INR0305)

MRG Goody Storage grid connection (ERCOT 24INR0305) is a grid connection under construction in Lamar County, Texas, United States, with 52.3 MW of capacity, held by MRG Goody Solar Project LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationLamar County (connects at Tap 138 kV Toco Switch (#1700) – Paris Switch (#1693))ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusUnder construction (screening study completed, full interconnection study completed, interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderMRG Goody Solar Project LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity52.3 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyStorageERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date10 May 2022ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date28 Aug 2026 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

MRG Goody Storage grid connection (ERCOT 24INR0305) is the 1,581st-largest of 1,710 grid connections in Texas and the 3,234th-largest of 4,021 in the United States by capacity; its 52.3 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas1,581st of 1,710438,874 MW<0.1%
United States3,234th of 4,021923,876 MW<0.1%
All grid connections in our data4,013th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Was due to connect; the register does not list it as connected

Holder, grid operator and place

More from MRG Goody Solar Project LLC

Other grid connections in Texas

All 1874 grid connections in Texas, United States