Grid connection · Haskell County, Texas, United States

Rubicon Alpha Wind grid connection (Ercot 24INR0291)

Rubicon Alpha Wind grid connection (Ercot 24INR0291) is a planned grid connection in Haskell County, Texas, United States, with 223 MW of capacity, held by Throckmorton Wind, LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceRubicon Alpha Wind grid connection (ERCOT 24INR0291)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
LocationHaskell County (connects at 60507 pendulo7A 345kV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (SS completed, FIS completed, IA)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderThrockmorton Wind, LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity223 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyWind (registered as WIN/WT)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date10 May 2022ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date31 Jul 2027 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Rubicon Alpha Wind grid connection (Ercot 24INR0291) is the 631st-largest of 1,710 grid connections in Texas and the 1,118th-largest of 3,711 in the United States by capacity; its 223 MW is <0.1% of the 833,233 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas631st of 1,710438,874 MW<0.1%
United States1,118th of 3,711833,233 MW<0.1%
All grid connections in our data1,437th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Holder, grid operator and place

More from Throckmorton Wind, LLC

Other grid connections in Texas

All 1874 grid connections in Texas, United States

Data on this page