Grid connection · Zapata County, Texas, United States

Cascabel Wind 2 grid connection (Ercot 23INR0561)

Cascabel Wind 2 grid connection (Ercot 23INR0561) is a planned grid connection in Zapata County, Texas, United States, with 198 MW of capacity, held by Vaquero Wind Energy, LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceCascabel Wind 2 grid connection (ERCOT 23INR0561)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
LocationZapata County (connects at 345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307).)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (SS completed, FIS started, IA)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderVaquero Wind Energy, LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity198 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyWind (registered as WIN/WT)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date13 Mar 2023ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date1 Dec 2027 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Cascabel Wind 2 grid connection (Ercot 23INR0561) is the 976th-largest of 1,710 grid connections in Texas and the 1,642nd-largest of 3,711 in the United States by capacity; its 198 MW is <0.1% of the 833,233 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas976th of 1,710438,874 MW<0.1%
United States1,642nd of 3,711833,233 MW<0.1%
All grid connections in our data1,974th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Holder, grid operator and place

More from Vaquero Wind Energy, LLC

Other grid connections in Texas

All 1874 grid connections in Texas, United States