Grid connection · Bell County, Texas, United States

Limewood Solar grid connection (ERCOT 23INR0249)

Limewood Solar grid connection (ERCOT 23INR0249) is a grid connection under construction in Bell County, Texas, United States, with 205 MW of capacity, held by Limewood Bell Renewables LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBell County (connects at 3420 Temple Pecan Creek 138kV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusUnder construction (screening study completed, full interconnection study completed, interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderLimewood Bell Renewables LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity205 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologySolarERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date30 Apr 2021ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date29 Dec 2026 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Limewood Solar grid connection (ERCOT 23INR0249) is the 751st-largest of 1,710 grid connections in Texas and the 1,419th-largest of 4,021 in the United States by capacity; its 205 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas751st of 1,710438,874 MW<0.1%
United States1,419th of 4,021923,876 MW<0.1%
All grid connections in our data1,740th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect

Holder, grid operator and place

More from Limewood Bell Renewables LLC

Other grid connections in Texas

All 1874 grid connections in Texas, United States

Data on this page