Grid connection · Callahan County, Texas, United States

Baird North Wind grid connection (ERCOT 20INR0083)

Baird North Wind grid connection (ERCOT 20INR0083) is a grid connection under construction in Callahan County, Texas, United States, with 340 MW of capacity, held by BMP Wind, LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCallahan County (connects at 68008 Latimer 345kV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusUnder construction (screening study completed, full interconnection study completed, interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderBMP Wind, LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity340 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyWindERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date4 May 2018ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date31 Dec 2026 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Baird North Wind grid connection (ERCOT 20INR0083) is the 317th-largest of 1,710 grid connections in Texas and the 698th-largest of 4,021 in the United States by capacity; its 340 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas317th of 1,710438,874 MW<0.1%
United States698th of 4,021923,876 MW<0.1%
All grid connections in our data1,003rd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect

Holder, grid operator and place

Other grid connections in Texas

All 1874 grid connections in Texas, United States

Data on this page