Grid connection · Nolan County, Texas, United States

Sweetwater 1 repower grid connection (ERCOT 18INR0073)

Sweetwater 1 repower grid connection (ERCOT 18INR0073) is a planned grid connection in Nolan County, Texas, United States, with 3 MW of capacity, held by Leeward Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNolan County (connects at 71050 Bitter Creek 345kV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study completed, interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderLeeward EnergyERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity3 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologyWindERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date9 Feb 2018ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date30 Nov 2024 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Sweetwater 1 repower grid connection (ERCOT 18INR0073) is the 1,703rd-largest of 1,710 grid connections in Texas and the 3,994th-largest of 4,021 in the United States by capacity; its 3 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas1,703rd of 1,710438,874 MW<0.1%
United States3,994th of 4,021923,876 MW<0.1%
All grid connections in our data7,061st of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Was due to connect; the register does not list it as connected