Bonanza Peak Solar Farm grid connection (CAISO 1655)

Bonanza Peak Solar Farm grid connection (CAISO 1655) is a planned grid connection in Clark County, Nevada, United States, with 400 MW of capacity, connected by California Independent System Operator Corporation.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBONANZA PEAK SOLAR FARM grid connection (CAISO 1655)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
LocationClark County (connects at Trout Canyon Substation 230 kV), Nye County (connects at Trout Canyon Substation 230 kV)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
StatusPlanned (active; interconnection agreement executed, cluster C12)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
Capacity400 MWCAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
TechnologyStorage (registered as Storage Battery / Photovoltaic Solar)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
TechnologySolar (registered as Storage Battery / Photovoltaic Solar)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
Grid operatorCalifornia Independent System Operator CorporationCAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
Queue date12 Apr 2019CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
Connection date31 Dec 2027 (proposed)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue

How it compares

Bonanza Peak Solar Farm grid connection (CAISO 1655) is the 15th-largest of 53 grid connections in Nevada and the 549th-largest of 4,021 in the United States by capacity; its 400 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Nevada15th of 5316,392 MW2.4%
United States549th of 4,021923,876 MW<0.1%
All grid connections in our data852nd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect