Grid connection · Nye County, Nevada, United States

Rough Hat Hybrid Solar grid connection (CAISO 1650)

Rough Hat Hybrid Solar grid connection (CAISO 1650) is a planned grid connection in Nye County, Nevada, United States, with 200 MW of capacity, connected by California Independent System Operator Corporation.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceROUGH HAT HYBRID SOLAR grid connection (CAISO 1650)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
LocationNye County (connects at Trout Canyon Substation 230 kV)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
StatusPlanned (active; interconnection agreement executed, cluster C12)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
Capacity200 MWCAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
TechnologyStorage (registered as Photovoltaic Solar / Storage Battery)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
TechnologySolar (registered as Photovoltaic Solar / Storage Battery)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
Grid operatorCalifornia Independent System Operator CorporationCAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
Queue date15 Apr 2019CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
Connection date13 Dec 2028 (proposed)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue

How it compares

Rough Hat Hybrid Solar grid connection (CAISO 1650) is the 37th-largest of 53 grid connections in Nevada and the 1,622nd-largest of 4,021 in the United States by capacity; its 200 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Nevada37th of 5316,392 MW1.2%
United States1,622nd of 4,021923,876 MW<0.1%
All grid connections in our data1,943rd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect

Grid operator and place

More from California Independent System Operator Corporation

Other grid connections in Nevada

All 53 grid connections in Nevada, United States