Grid connection · Cass County, Michigan, United States
Cass County Solar grid connection (PJM AF2-396)
Cass County Solar grid connection (PJM AF2-396) is a planned grid connection in Cass County, Michigan, United States, with 200 MW of capacity, held by Steelhead Solar, LLC.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Cass County (connects at Stinger 138 kV) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Status | Planned (engineering and procurement, cluster TC1 FINAL AGREEMENT) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Holder | Steelhead Solar, LLC | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Capacity | 200 MW | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Technology | Storage (registered as Solar,Storage,Hybrid) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Technology | Solar (registered as Solar,Storage,Hybrid) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Grid operator | PJM Interconnection, L.L.C. | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Queue date | 31 Mar 2020 | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Connection date | 1 Jun 2029 (proposed) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchLatest events
Dated events about this grid connection from official notices and registers, newest first. All recent changes.
- Entered the connection queue
How it compares
Cass County Solar grid connection (PJM AF2-396) is the 4th-largest of 22 grid connections in Michigan and the 1,622nd-largest of 4,021 in the United States by capacity; its 200 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Michigan | 4th of 22 | 3,074 MW | 6.5% |
| United States | 1,622nd of 4,021 | 923,876 MW | <0.1% |
| All grid connections in our data | 1,943rd of 7,928 | 1,372,494 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Due to connect
Holder, grid operator and place
Other grid connections in Michigan
- Olive - Cook 345 kV grid connection (PJM C01-2194)300 MW
- Three Lakes Solar grid connection (PJM AF1-176 - moved to TC1)300 MW
- Three Lakes Solar grid connection (PJM AF1-176)300 MW
- Cass County Solar grid connection (PJM AF2-396 - moved to TC1)200 MW
- Sodus 138 kV grid connection (PJM C01-1350)200 MW
- Twin Branch - Argenta 345 kV grid connection (PJM C01-1203)200 MW
- Twin Branch - Argenta 345 kV grid connection (PJM C01-1409)200 MW
- Blossom Trail 138kV 138 kV grid connection (PJM C01-1596)150 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.