Grid connection · Will County, Illinois, United States
Jackson Generation grid connection (PJM AD2-194)
Jackson Generation grid connection (PJM AD2-194) is a grid connection under construction in Will County, Illinois, United States, with 60 MW of capacity, connected by PJM Interconnection, L.L.C.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Will County (connects at Elwood 345 kV) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Status | Under construction (partially in service) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Capacity | 60 MW | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Technology | Natural gas (registered as Natural Gas) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Grid operator | PJM Interconnection, L.L.C. | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Queue date | 31 Mar 2018 | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
| Connection date | 1 Jan 2027 (proposed) | PJM New Services Queue · Free reuse · checked 24 Oct 2026 |
Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.
Request researchHow it compares
Jackson Generation grid connection (PJM AD2-194) is the 155th-largest of 194 grid connections in Illinois and the 2,878th-largest of 3,711 in the United States by capacity; its 60 MW is <0.1% of the 833,233 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Illinois | 155th of 194 | 35,521 MW | 0.17% |
| United States | 2,878th of 3,711 | 833,233 MW | <0.1% |
| All grid connections in our data | 3,551st of 7,616 | 1,281,251 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Grid operator and place
More from PJM Interconnection, L.L.C.
- Bruce Mansfield 345 kV grid connection (PJM C01-1243)2,500 MW
- Joshua Falls 765 kV grid connection (PJM C01-1390)2,300 MW
- Rockport - Jefferson 765 kV grid connection (PJM C01-1391)2,300 MW
- Rockport - Jefferson 765 kV grid connection (PJM C01-1392)2,300 MW
- Rockport - Jefferson 765 kV grid connection (PJM C01-1393)2,300 MW
- Sullivan 765 kV grid connection (PJM C01-1394)2,300 MW
- Sullivan 765 kV grid connection (PJM C01-1395)2,300 MW
- Flint Run 500 kV grid connection (PJM AG2-582)2,100 MW
Other grid connections in Illinois
- Crescent Ridge - Corbin 138 kV grid connection (PJM C01-2036)1,150 MW
- Collins 345 kV grid connection (PJM C01-1808)940 MW
- Heritage Prairie Wind grid connection (PJM AD1-100)850 MW
- Calumet - Burnham 345 kV grid connection (PJM C01-1355)500 MW
- Chestnut - Blue Mound 345 kV grid connection (PJM C01-1870)500 MW
- TSS 903 Tovey 345 kV grid connection (PJM C01-2154)500 MW
- Wayne - Byron 345 kV grid connection (PJM C01-1786)500 MW
- Dresden - Mulberry 345 kV grid connection (PJM C01-1770)450 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.