Grid connection · West Pomeranian Voivodeship, Poland

EF Choszczno 9 (EF Żeńsko)(wzrost mocy przył. i zainst. o EF) (komercja): 110 kV connection request to Enea Operator

EF Choszczno 9 (EF Żeńsko)(wzrost mocy przył. i zainst. o EF) (komercja): 110 kV connection request to Enea Operator is a grid connection in West Pomeranian Voivodeship, Poland.

We hold more on this grid connection.Application date, attached to, capacity, grid operator, location, status and technology: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAvailable on requestEnea Operator: available connection capacity maps (Power BI) · Restricted · checked 24 Oct 2026
StatusAvailable on requestEnea Operator: available connection capacity maps (Power BI) · Restricted · checked 24 Oct 2026
Application dateAvailable on requestEnea Operator: available connection capacity maps (Power BI) · Restricted · checked 24 Oct 2026
Attached toAvailable on requestEnea Operator: available connection capacity maps (Power BI) · Restricted · checked 24 Oct 2026
CapacityAvailable on requestEnea Operator: available connection capacity maps (Power BI) · Restricted · checked 24 Oct 2026
TechnologyAvailable on requestEnea Operator: available connection capacity maps (Power BI) · Restricted · checked 24 Oct 2026
Grid operatorAvailable on requestEnea Operator: available connection capacity maps (Power BI) · Restricted · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

Place

Other grid connections in West Pomeranian Voivodeship

All 3 grid connections in West Pomeranian Voivodeship, Poland

Data on this page