Grid connection · Mexico
Cimarron Wind grid connection (Caiso 1660)
Cimarron Wind grid connection (Caiso 1660) is a planned grid connection in Mexico, with 300 MW of capacity, connected by California Independent System Operator Corporation.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | CIMARRON WIND grid connection (CAISO 1660) | CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026 |
| Location | Mexico (connects at East County Substation 230 kV) | CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026 |
| Status | Planned (ACTIVE; IA executed, cluster C12) | CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026 |
| Capacity | 300 MW | CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026 |
| Technology | Wind (registered as Wind Turbine) | CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026 |
| Grid operator | California Independent System Operator Corporation | CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026 |
| Queue date | 15 Apr 2019 | CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026 |
| Connection date | 31 Aug 2035 (proposed) | CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026 |
Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.
Request researchHow it compares
Cimarron Wind grid connection (Caiso 1660) is the 2nd-largest of 2 grid connections in Mexico by capacity; its 300 MW is 24% of the 1,273 MW we hold for Mexico. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Mexico | 2nd of 2 | 1,273 MW | 24% |
| All grid connections in our data | 1,052nd of 7,616 | 1,281,251 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Grid operator and place
More from California Independent System Operator Corporation
- Atlas Complex grid connection (Caiso 1402)3,200 MW
- Holman grid connection (Caiso 1889)1,500 MW
- Sanborn Hybrid 3 grid connection (Caiso 1632)1,400 MW
- Angeleno Solar Farm grid connection (Caiso 1625)1,150 MW
- Wingtip Solar 1 grid connection (Caiso 1943)1,150 MW
- Darden grid connection (Caiso 1949)1,150 MW
- Umbriel grid connection (Caiso 2166)1,150 MW
- Windwalker Offshore grid connection (Caiso 1750)1,000 MW
Other grid connections in Mexico
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.