Grid connection · England, United Kingdom
Wragby grid connection
Wragby grid connection is a grid connection in England, United Kingdom.
We hold more on this right.Attached to, capacity, connection date, grid operator, holder, location, status, technology and voltage: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Status | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Holder | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Attached to | Available on request | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Capacity | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Technology | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Grid operator | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Connection date | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Voltage | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Coordinates | 53.2747, -0.2976 | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its owner? Ask us.
Nearby
Within 50 km of this grid connection: 341 power plants (91 operating, 1,077 MW), 54 substations, 5 transmission lines and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Primrose Hill Farm | Power plant | 3.7 MW | Operating | 0.4 km |
| Hatton Solar Farm | Power plant | 49.9 MW | Permitted | 5.8 km |
| Stainton Oil Production Facility | Power plant | 28 MW | Cancelled | 8.2 km |
| Belmont Covert | Substation | — | — | 12 km |
| Walesby | Substation | — | — | 14 km |
| Normanby | Substation | — | — | 16 km |
| Grimsby to Walpole | Transmission line | — | Planned | 30 km |
| Eastern Green Link 3 and Eastern Green Link 4 | Transmission line | — | Planned | 37 km |
| Triton Knoll Electrical System | Transmission line | — | Permitted | 39 km |
Place
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.