Grid connection · England, United Kingdom

Gallos grid connection

Gallos grid connection is a planned grid connection in England, United Kingdom, with 2,000 MW of capacity, held by Corio Generation Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Alverdiscott 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderCorio Generation LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toGallosNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity2,000 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date6 Dec 2036NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Gallos grid connection is the 18th-largest of 2,678 grid connections in England and the 21st-largest of 4,493 in the United Kingdom by capacity; its 2,000 MW is 0.44% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England18th of 2,678322,469 MW0.62%
United Kingdom21st of 4,493459,551 MW0.44%