Data center · Mecklenburg County, North Carolina, United States

SEGRA data center

SEGRA data center is a data center in Mecklenburg County, North Carolina, United States, with a 1,685 m² building. It is in an area of high water stress.

Power and water

Water stress here is high: withdrawals take 72.7% of the renewable water supply of its sub-basin (WRI Aqueduct 4.0, baseline, score 3.9 of 5).

Distances run between the points of the records. How the grid and plants nearby are found; water stress from WRI Aqueduct 4.0.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMecklenburg County, North CarolinaOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Address1612 Cross Beam Drive, Charlotte, NC 28217OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Water stressHigh (40–80%) (score 3.9 of 5, withdrawals 72.7% of renewable supply)WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026
Building footprint1,685 m² (building)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates35.1801, -80.9264OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its owner.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the owner.

Request research

Nearby

Within 50 km of this data center: 9 power plants (7 operating, 11,205 MW) and 3 mines, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Allen 2 BESSPower plant167 MWPlanned7.7 km
G G AllenPower plant1,148 MWClosed7.9 km
CatawbaPower plant2,410 MWOperating19 km
Battleground MillMine—Operating40 km
Moss Mill & MinesMine—Operating41 km
Sericite MineMine—Operating48 km

Place

Other data centers in North Carolina

All 23 data centers in North Carolina, United States

Data on this page