Data center · Amsterdam, North Holland, Netherlands

Gyro Center datacenter

Gyro Center datacenter is a data center in Amsterdam, North Holland, Netherlands, with a 1,369 m² site, operated by Gyro Center. It lies 0.4 km from a 150 kV substation, has 155 MW of power plants within 10 km and is in an area of low water stress.

Power and water

The nearest substation is 150 kV Hemweg, a 150 kV substation, 0.4 km away.

Power plants of 50 MW or more in operation within 10 km: 155 MW of waste-to-energy (Waste incineration Amsterdam (Aeb Exploitatie)).

Water stress here is low: withdrawals take 7.5% of the renewable water supply of its sub-basin (WRI Aqueduct 4.0, baseline, score 0.6 of 5).

Distances run between the points of the records. How the grid and plants nearby are found; water stress from WRI Aqueduct 4.0.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAmsterdam, North HollandOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
OperatorGyro CenterOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Nearest substation150 kV Hemweg (0.38 km away, at 150 kV)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Water stressLow (under 10%) (score 0.6 of 5, withdrawals 7.5% of renewable supply)WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026
Building footprint1,369 m² (site outline)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Large generation within 10 km155 MW (waste, 1 plant, nearest 3.3 km away)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Coordinates52.4006, 4.8432OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.

Request research

Nearby

Within 50 km of this data center: 624 permit notices, 427 power plants (339 operating, 5,351 MW), 95 substations, 64 CO2 emitters (37 operating) and 2 AI supercomputers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Substation omgevingsvergunning decision, Amsterdam (gmb-2025-182730)Permit notice——0.4 km
150 kV HemwegSubstation——0.4 km
Substation omgevingsvergunning decision, Amsterdam (gmb-2025-178571)Permit notice——0.4 km
Centrale HemwegPower plant440 MWOperating0.4 km
Substation omgevingsvergunning application, Amsterdam (gmb-2026-234194)Permit notice——0.5 km
Vattenfall Centrale HemwegCO2 emitter639,359 tCO2e—0.7 km
Solar Amsterdam (Cofra)Power plant1.6 MWOperating1.1 km
Solar Amsterdam (Eggerding)Power plant2.6 MWOperating1.3 km
150 kV substation (OSM way/27130532)Substation——2.3 km

Operator and place

Other data centers in North Holland

All 85 data centers in North Holland, Netherlands