Data center · Meppel, Drenthe, Netherlands

Kolo NL2 Meppel

Kolo NL2 Meppel is a data center in Meppel, Drenthe, Netherlands, operated by Kolo.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMeppel, DrentheOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
AddressKetelskamp 10, 7942KG MeppelOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
OperatorKoloOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Websitehttps://kolodc.com/data-centers/colocation-in-the-netherlands/meppel-data-centerOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates52.7178, 6.2002OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.

Request research

How its operator compares

Kolo operates 4 of the 89 data centers in the Netherlands in our data with a named owner; 6 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in NetherlandsRankData centersShare
Digital Realty1st1315%
Equinix, Inc.2nd1213%
Microsoft3rd910%
NorthC3rd910%
EdgeConnex5th77.9%
Kolo7th44.5%

Nearby

Within 50 km of this data center: 536 permit notices, 326 power plants (268 operating, 4,531 MW), 72 substations and 25 CO2 emitters (17 operating), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar Meppel (Sunrock Assets XII)Power plant4.92 MWCancelled0.2 km
Substation omgevingsvergunning decision, Meppel (gmb-2024-519462)Permit notice——0.2 km
Solar Meppel (Groendus Projecten)Power plant1.4 MWCancelled3.2 km
Nitrogen natuurvergunning decision, De Wolden (prb-2025-19004)Permit notice——3.7 km
Nitrogen natuurvergunning draft decision, De Wolden (prb-2025-15226)Permit notice——3.7 km
110 kV MeppelSubstation——3.9 km
Zonnepark SteenwijkerlandPower plant39.6 MWOperating6.5 km
110 kV SteenwijkSubstation——7.6 km
Green gas Giethoorn (Agro Giethoorn Energie)CO2 emitter—Permitted11 km

Operator and place

More from Kolo