Data center · Wallonia, Belgium
DC Moeskroen
DC Moeskroen is a data center in Wallonia, Belgium, operated by Datacenter United.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Wallonia | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | Rue de l'Abattoir - Slachthuisstraat 31 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | Datacenter United | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Website | https://datacenterunited.com/datacenters/dc-moeskroen | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 1,002 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 50.7522, 3.2288 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
Datacenter United operates 10 of the 28 data centers in Belgium in our data with a named owner; the most of any owner. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in Belgium | Rank | Data centers | Share |
|---|---|---|---|
| Datacenter United | 1st | 10 | 36% |
| Digital Realty | 2nd | 3 | 11% |
| 2nd | 3 | 11% | |
| LCL | 4th | 2 | 7.1% |
| Telenet Group NV | 4th | 2 | 7.1% |
Nearby
Within 50 km of this data center: 2 substations and 2 CO2 emitters (1,602,986 tCO2e), measured from the coordinates in the facts above.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Avelgem 380 kV | Substation | — | — | 17 km |
| Heidelberg Materials Benelux - Cimenterie Antoing | CO2 emitter | 562,540 tCO2e | — | 25 km |
| CCB Cimenterie Gaurain | CO2 emitter | 1,040,446 tCO2e | — | 27 km |
| Horta 380 kV | Substation | — | — | 48 km |
Operator and place
More from Datacenter United
- DC Mechelendata center
- DC Flandersdata center
- DC Everedata center
- DC Antwerpdata center
- Brussels DCdata center
- DC Machelendata center
- Datacenter Gentdata center
- DC Hasselt 1data center
Other data centers in Wallonia
Data on this page
- Elia grid hosting capacity map. Elia grid hosting capacity map, Restricted.
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.