CO2 emitter · Veenendaal, Utrecht, Netherlands

Heat pump Veenendaal (Duurzaam Opwekken Veenendaal)

Heat pump Veenendaal (Duurzaam Opwekken Veenendaal) is a cancelled CO2 emitter in Veenendaal, Utrecht, Netherlands, operated by Duurzaam Opwekken Veenendaal.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationVeenendaalRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
StatusCancelled (withdrawn from the list of projects in management before it was realised)RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
OperatorDuurzaam Opwekken VeenendaalRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Capacity4.21 MWRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
TechnologyHeat pumpRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Coordinates52.0320, 5.5538RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026

Research on this CO2 emitter and its operator.Who owns it up to the parent company, its emissions and permits, and an introduction to the operator.

Request research

How its operator compares

Duurzaam Opwekken Veenendaal operates 2 of the 295 CO2 emitters in the Netherlands in our data with a named owner; 11 owners have more. Counts cover the CO2 emitters in our data that name an owner, holder or operator; an asset with several owners counts for each.

Nearby

Within 50 km of this CO2 emitter: 1,033 permit notices, 521 power plants (408 operating, 4,388 MW), 82 substations, 11 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Substation omgevingsvergunning decision, Veenendaal (gmb-2024-550358)Permit notice——1.0 km
150 kV 't Goeie SpoorSubstation——1.0 km
Substation omgevingsvergunning decision, Veenendaal (gmb-2024-549596)Permit notice——1.1 km
Nitrogen natuurvergunning decision, Renswoude (prb-2025-17285)Permit notice——1.9 km
Solar De Klomp (Dutch Durables Energy 5)Power plant1.77 MWOperating2.2 km
Solar Veenendaal (Heuvelman Staalhandel)Power plant1.96 MWOperating3.3 km
150 kV WageningselaanSubstation——3.3 km
Wind Ede Gld (WP Ede)Power plant6.4 MWOperating3.6 km
BIT-2 DatacenterData center——4.8 km

Operator and place

More from Duurzaam Opwekken Veenendaal

Other CO2 emitters in Utrecht

All 13 CO2 emitters in Utrecht, Netherlands