CO2 emitter · Rijssen-Holten, Overijssel, Netherlands

Heat pump Rijssen (Ter Steege Industrie)

Heat pump Rijssen (Ter Steege Industrie) is a cancelled CO2 emitter in Rijssen-Holten, Overijssel, Netherlands, operated by Ter Steege Industrie B.V.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRijssen-HoltenRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
StatusCancelled (withdrawn from the list of projects in management before it was realised)RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
OperatorTer Steege Industrie B.V.RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Capacity1.1 MWRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
TechnologyHeat pumpRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Coordinates52.3212, 6.5167RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026

Research on this CO2 emitter and its operator.Who owns it up to the parent company, its emissions and permits, and an introduction to the operator.

Request research

Nearby

Within 50 km of this CO2 emitter: 645 permit notices, 333 power plants (253 operating, 2,453 MW), 101 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar Rijssen (Ter Steege Industrie)Power plant2.56 MWOperating0.0 km
Biomass Rijssen (Hoekman Houtindustrie Rijssen)Power plant1.5 MWOperating0.7 km
Solar Rijssen (Solar Rijssen)Power plant1 MWOperating2.4 km
Nitrogen natuurvergunning application, Wierden (prb-2026-14686)Permit notice——3.2 km
Nitrogen natuurvergunning decision, Wierden (prb-2024-19956)Permit notice——3.2 km
Substation omgevingsplan decision, Rijssen-Holten (gmb-2024-482286)Permit notice——3.5 km
110 kV RijssenSubstation——3.5 km
110 kV substation (OSM way/1117582183)Substation——6.3 km
110 kV NijverdalSubstation——6.4 km