CO2 emitter · Hardenberg, Overijssel, Netherlands

Green gas Anerveen (Bio Verwerker Anerveen)

Green gas Anerveen (Bio Verwerker Anerveen) is a permitted CO2 emitter in Hardenberg, Overijssel, Netherlands, operated by Bio Verwerker Anerveen B.V.

We hold more on this asset.Grid operator and location: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHardenbergRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Grid areaAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
AddressSlagenweg 5, 7788 AB AnerveenRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
StatusPermitted (SDE subsidy granted, not yet in use)RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
OperatorBio Verwerker Anerveen B.V.RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Capacity6.28 MWRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
TechnologyGreen gasRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Grid operatorAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
Coordinates52.6299, 6.6403RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026

Know more about this CO2 emitter, or want an introduction to its operator? Ask us.

Nearby

Within 50 km of this CO2 emitter: 303 power plants (233 operating, 3,291 MW), 97 substations and 3 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Biomass Anerveen (Bio Verwerker Anerveen)Power plant4.93 MWOperating0.0 km
Solar Gramsbergen (Pure Energie ZP Onder Ons)Power plant4.02 MWOperating3.7 km
Zonnepark CoevordenPower plant6.5 MWOperating4.0 km
110 kV CoevordenSubstation——5.7 km
110 kV HardenbergSubstation——6.8 km
110 kV Coevorden EuroparkSubstation——7.2 km
Kolo NL2 MeppelData center——31 km
Equinix Zwolle ZW1Data center——37 km
Equinix EnschedeData center——46 km

Operator and place

More from Bio Verwerker Anerveen B.V.

Other CO2 emitters in Overijssel

All 15 CO2 emitters in Overijssel, Netherlands