CO2 emitter · Bernheze, North Brabant, Netherlands

Green gas Nistelrode (BioValue Nistelrode)

Green gas Nistelrode (BioValue Nistelrode) is a permitted CO2 emitter in Bernheze, North Brabant, Netherlands, operated by BioValue Nistelrode B.V.

We hold more on this asset.Grid operator and location: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBernhezeRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Grid areaAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
AddressLoosbroekseweg 48, 5388 VP NistelrodeRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
StatusPermitted (SDE subsidy granted, not yet in use)RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
OperatorBioValue Nistelrode B.V.RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Capacity11.7 MWRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
TechnologyGreen gasRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Grid operatorAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
Coordinates51.7072, 5.5493RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026

Know more about this CO2 emitter, or want an introduction to its operator? Ask us.

Nearby

Within 50 km of this CO2 emitter: 1,044 permit notices, 679 power plants (515 operating, 4,426 MW), 79 substations and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar Oss (Plus Retail)Power plant5.12 MWOperating3.6 km
Solar Oss (Verhees Textiles)Power plant1.1 MWOperating3.8 km
Solarpark De MunPower plant8.31 MWOperating4.2 km
Groundwater abstraction watervergunning decision, Bernheze (wsb-2026-5580)Permit notice——4.7 km
Groundwater abstraction watervergunning decision, Bernheze (wsb-2025-27996)Permit notice——5.2 km
150 kV OssSubstation——6.4 km
150 kV UdenSubstation——7.5 km
Groundwater abstraction watervergunning decision, Oss (wsb-2026-14806)Permit notice——8.0 km
150 kV EerdeSubstation——12 km

Operator and place

Other CO2 emitters in North Brabant

All 47 CO2 emitters in North Brabant, Netherlands

Data on this page