CO2 emitter · West Betuwe, Gelderland, Netherlands

Biomass heat Vuren (Sonac Vuren)

Biomass heat Vuren (Sonac Vuren) is a CO2 emitter in West Betuwe, Gelderland, Netherlands, operated by Sonac Vuren B.V.

We hold more on this asset.Grid operator and location: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Grid areaAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
LocationWest BetuweRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
AddressZeiving 35, 4214 KT VurenRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
StatusOperatingRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Start year2014RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
OperatorSonac Vuren B.V.RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Capacity15.1 MWRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
TechnologyBiomass heatRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Grid operatorAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
Coordinates51.8413, 5.0936RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026

Know more about this CO2 emitter, or want an introduction to its operator? Ask us.

Nearby

Within 50 km of this CO2 emitter: 684 power plants (531 operating, 3,552 MW), 102 substations, 15 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar Vuren (Den Hartog en Bikker Vastgoed)Power plant2.35 MWPlanned0.4 km
Solar Vuren (Rooftop Energy)Power plant1.07 MWOperating0.8 km
Solar Brakel (EGP Solar Brakel I)Power plant1.13 MWOperating3.8 km
150 kV ZuilichemSubstation——5.1 km
150 kV ArkelSubstation——7.8 km
150 kV substation (OSM way/165278333)Substation——7.9 km
Eurofiber Data center BrabantData center——17 km
NorthC NieuwegeinData center——20 km
Interconnect Den BoschData center——24 km

Operator and place

Other CO2 emitters in Gelderland

All 27 CO2 emitters in Gelderland, Netherlands

Data on this page