Power plant · Flevoland, Netherlands

Maximacentrale

Maximacentrale is a power plant in Flevoland, Netherlands, with 872 MW of capacity, owned by Engie S.A.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationFlevolandJRC Open Power Plants Database (JRC-PPDB-OPEN) · CC BY 4.0 · checked 24 Oct 2026
LocationNetherlandsEU Union Registry public data · CC BY 4.0 · checked 24 Oct 2026
AddressIJsselmeerdijk 101, 8221 RC LELYSTADEU Union Registry public data · CC BY 4.0 · checked 24 Oct 2026
StatusOperatingDutch power station owners' and operators' pages · record · Facts only, each linked to its page · checked 24 Oct 2026
Start year2010JRC Open Power Plants Database (JRC-PPDB-OPEN) · CC BY 4.0 · checked 24 Oct 2026
OwnerEngie S.A. (group)Dutch power station owners' and operators' pages · record · Facts only, each linked to its page · checked 24 Oct 2026
OperatorENGIE Energie Nederland N.V.EU Union Registry public data · CC BY 4.0 · checked 24 Oct 2026
Capacity872 MW (sum of operating units, NaN parts)JRC Open Power Plants Database (JRC-PPDB-OPEN) · CC BY 4.0 · checked 24 Oct 2026
Units2 unitsJRC Open Power Plants Database (JRC-PPDB-OPEN) · CC BY 4.0 · checked 24 Oct 2026
TechnologyNatural gasJRC Open Power Plants Database (JRC-PPDB-OPEN) · CC BY 4.0 · checked 24 Oct 2026
ActivityCombustion of fuelsEU Union Registry public data · CC BY 4.0 · checked 24 Oct 2026
Verified emissions1,216,922 tCO2e (in 2025)EU Union Registry public data · CC BY 4.0 · checked 24 Oct 2026
Coordinates52.5770, 5.5300JRC Open Power Plants Database (JRC-PPDB-OPEN) · CC BY 4.0 · checked 24 Oct 2026

Research on this power plant and its owner.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the owner.

Request research

Also recorded as

2 sources record Maximacentrale; this page joins their facts, each with its own source. Links to any of the records lead here. How records are matched.

Name in the sourceIdentifierSourceMatched on
Maximacentraleasset:eic:49W000000000072VJRC Open Power Plants Database (JRC-PPDB-OPEN)—
ENGIE Maximacentraleasset:eu-ets:nl-155EU Union Registry public dataSame name, coordinates and operator

How it compares

Maximacentrale is the largest of 116 power plants in Flevoland and the 8th-largest of 2,153 in the Netherlands by capacity; its 872 MW is 2.3% of the 37,557 MW we hold for the Netherlands. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Flevoland1st of 1163,507 MW25%
Netherlands8th of 2,15337,557 MW2.3%
All power plants in our data414th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating
  2. Verified emissions: 1,216,922 tCO2e

Nearby

Within 50 km of this power plant: 625 permit notices, 77 substations, 46 CO2 emitters (29 operating), 32 data centers, 2 AI supercomputers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
ENGIE MaximacentraleCO2 emitter1,216,922 tCO2e—0.1 km
150 kV LelystadSubstation——0.4 km
Substation omgevingsvergunning application, Lelystad (gmb-2026-213751)Permit notice——0.5 km
Substation omgevingsplan decision, Lelystad (gmb-2026-425309)Permit notice——0.6 km
Substation omgevingsvergunning application, Lelystad (gmb-2026-287190)Permit notice——0.6 km
380 kV LelystadSubstation——0.6 km
150 kV WindplanblauwSubstation——5.4 km
Biomass heat Lelystad (Primco BMC Lelystad)CO2 emitter—Operating11 km
Green gas Biddinghuizen (De Torenhoeve Biogas)CO2 emitter—Operating12 km

Owner, operator and place

More from Engie S.A.

Other power plants in Flevoland

All 129 power plants in Flevoland, Netherlands

Data on this page