Planned substation (search area Stadt Zerbst/Anhalt) is a planned 380 kV substation in Thuringia, Germany, connected by 50Hertz Transmission GmbH.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationThuringiaNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
StatusPlannedNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Grid operator50Hertz Transmission GmbHNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcement380 kV shunt reactor (1x 176 Mvar) (due 2037, transmission network, NEP measure M685n, project P360, added by this plan, confirmed by the previous plan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Voltage380 kVNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Request research

Grid operator and place

More from 50Hertz Transmission GmbH

Other substations in Thuringia

All 158 substations in Thuringia, Germany

Data on this page