Substation · Thuringia, Germany

Planned substation (search area Gemeinde Osterburg)

Planned substation (search area Gemeinde Osterburg) is a planned substation in Thuringia, Germany, connected by 50Hertz Transmission GmbH.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationThuringiaNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
StatusPlannedNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Grid operator50Hertz Transmission GmbHNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcementMSCDN (2x) (due 2037, transmission network, NEP measure M7n, project P360, added by this plan, confirmed by the previous plan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.