Substation · North Rhine-Westphalia, Germany
Westerkappeln/Suchraum Telgte substation
Westerkappeln/Suchraum Telgte substation is a 380 kV substation in North Rhine-Westphalia, Germany, connected by Amprion GmbH.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Rhine-Westphalia | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Amprion GmbH | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
| Planned reinforcement | 380 kV shunt reactor (due 2032, transmission network, NEP measure M412b24, project P412, added by this plan) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 380 kV | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.
Request researchGrid operator and place
More from Amprion GmbH
- Aach substationsubstation
- Station Arpesubstation
- Arpe/Halbeswig substationsubstation
- Bischofsheim substationsubstation
- Brauweiler substationsubstation
- Station Büscherhofsubstation
- Umspannwerk Dettingensubstation
- Station Eibergsubstation
Other substations in North Rhine-Westphalia
Data on this page
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.