Substation · Dorsten, North Rhine-Westphalia, Germany

Umspannwerk Wessendorf (Wessendorf substation)

Umspannwerk Wessendorf is a 110 kV substation in Dorsten, North Rhine-Westphalia, Germany, connected by Umspannwerk Wessendorf GmbH.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Rhine-WestphaliaOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
LocationDorsten (point in boundary)BKG Verwaltungsgebiete 1:250 000 (VG250) · DL-DE-BY-2.0 · checked 25 Oct 2026
Grid operatorUmspannwerk Wessendorf GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates51.7880, 7.0190OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Request research

Nearby

Within 50 km of this substation: 202 power plants (113 operating, 4,310 MW), 118 permit notices, 32 CO2 emitters (4 operating), 7 data centers and 2 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Lembecker ElvenPower plant36 MWPlanned2.7 km
WessendorfPower plant48 MWOperating3.2 km
Windpark Dorsten TorfvennPower plant16.5 MWOperating3.9 km
Kraftwerk VICO2 emitter491,142 tCO2e—13 km
Kraftwerk VIICO2 emitter203,238 tCO2e—13 km
Wasserstoff-AnlageCO2 emitter184,414 tCO2e—13 km
Nitrogen natuurvergunning decision, Winterswijk (prb-2025-20128)Permit notice——24 km
Nitrogen natuurvergunning draft decision, Winterswijk (prb-2025-16884)Permit notice——24 km
Solar park omgevingsvergunning decision, Winterswijk (gmb-2025-344703)Permit notice——24 km

Grid operator and place

Candidate sites around this substation

1 site of land near Umspannwerk Wessendorf has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in North Rhine-Westphalia

All 930 substations in North Rhine-Westphalia, Germany

Data on this page