Substation · North Rhine-Westphalia, Germany
Umspannwerk Coesfeld-Lette
Umspannwerk Coesfeld-Lette is a 110 kV substation in North Rhine-Westphalia, Germany, connected by Windpark Coesfeld Letter Bruch GmbH & Co. KG.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Rhine-Westphalia | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Grid operator | Windpark Coesfeld Letter Bruch GmbH & Co. KG | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 51.8768, 7.1452 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.
Request researchNearby
Within 50 km of this substation: 229 power plants (132 operating, 3,955 MW), 128 permit notices, 20 CO2 emitters (3 operating), 9 data centers and 2 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Coesfeld | Power plant | 52.8 MW | Operating | 1.3 km |
| Bürgerwindpark Flamschen | Power plant | 47.6 MW | Operating | 1.9 km |
| Coesfeld Letter Bruch | Power plant | 17.1 MW | Planned | 2.0 km |
| Kraftwerk VI | CO2 emitter | 491,142 tCO2e | — | 23 km |
| Kraftwerk VII | CO2 emitter | 203,238 tCO2e | — | 23 km |
| Wasserstoff-Anlage | CO2 emitter | 184,414 tCO2e | — | 23 km |
| Nitrogen natuurvergunning decision, Winterswijk (prb-2025-20128) | Permit notice | — | — | 24 km |
| Nitrogen natuurvergunning draft decision, Winterswijk (prb-2025-16884) | Permit notice | — | — | 24 km |
| Solar park omgevingsvergunning decision, Winterswijk (gmb-2025-344703) | Permit notice | — | — | 25 km |
Grid operator and place
Candidate sites around this substation
3 sites of land near Umspannwerk Coesfeld-Lette have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 97 ha site at Gemarkung Lette, Flur 37, Flurstück 401.67 km · score 48
- 69 ha site at Gemarkung Lette, Flur 26, Flurstück 491.09 km · score 48
- 51 ha site at Gemarkung Lette, Flur 25, Flurstück 651.9 km · score 28
Other substations in North Rhine-Westphalia
Data on this page
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.