Substation · Lower Saxony, Germany
Emden West
Emden West is a 110 kV substation in Lower Saxony, Germany, connected by Avacon Netz GmbH.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Lower Saxony | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Grid operator | Avacon Netz GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 53.3517, 7.1725 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.
Request researchNearby
Within 50 km of this substation: 251 power plants (193 operating, 9,590 MW), 153 permit notices, 20 CO2 emitters (10 operating) and 8 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| WEA Emden | Power plant | 11.5 MW | Operating | 1.4 km |
| Larrelter Polder | Power plant | 25.5 MW | Operating | 1.8 km |
| WP Wybelsumer Polder | Power plant | 32.8 MW | Operating | 2.6 km |
| Battery storage omgevingsvergunning application, Oldambt (gmb-2026-190409) | Permit notice | — | — | 13 km |
| Battery storage omgevingsvergunning decision, Oldambt (gmb-2026-444586) | Permit notice | — | — | 13 km |
| Green gas Farmsum (SFP Groningen) | CO2 emitter | — | Permitted | 15 km |
| Green gas Nieuwolda (BIO Deeterink) | CO2 emitter | — | Permitted | 15 km |
| Delesto B.V. | CO2 emitter | 317,750 tCO2e | — | 15 km |
| Substation omgevingsvergunning application, Eemsdelta (gmb-2025-291723) | Permit notice | — | — | 15 km |
Grid operator and place
More from Avacon Netz GmbH
Candidate sites around this substation
1 site of land near Emden West has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 60 ha site at Gemarkung Larrelt, Flur 12, Flurstück 3/370.02 km · score 64
Other substations in Lower Saxony
- 110 kV substation (OSM node/924018211)
- 110 kV substation (OSM way/1016436315)
- 110 kV substation (OSM way/1021637039)
- 110 kV substation (OSM way/1023904136)
- 110 kV substation (OSM way/1034844279)
- 110 kV substation (OSM way/1087945281)
- 110 kV substation (OSM way/1098352996)
- 110 kV substation (OSM way/1126924534)
Data on this page
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.