Substation · Bavaria, Germany

Reichenbach Siedlung 2

Reichenbach Siedlung 2 is a 150 kV substation in Bavaria, Germany, connected by Allgäuer Überland GmbH Kempten.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBavariaOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Grid operatorAllgäuer Überland GmbH KemptenOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage150 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates47.6210, 10.4750OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 27 power plants (17 operating, 286 MW), measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Hybridspeicher AUPower plant22.9 MWOperating14 km
Spitzenlastkraftwerk Veits DieseltandemPower plant10 MWOperating14 km
Photovoltaik-Kraftwerk KemptenPower plant13.8 MWPlanned15 km

Grid operator and place

Other substations in Bavaria

All 747 substations in Bavaria, Germany

Data on this page