Powered land · Saxony-Anhalt
130 ha site at Gemarkung Lüdelsen, Flur 6, Flurstück 7
A candidate site of 130 ha in Saxony-Anhalt, made up of 1 cadastral parcel, mostly forest. It lies 1.74 km from the 110 kV substation UW Nettgau (Avacon). The nearest transmission substation, Umspannwerk Hattorf (380 kV), is 34.2 km away.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 130 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Lüdelsen, Flur 6, Flurstück 7) | ALKIS Sachsen-Anhalt (open cadastre) · dl-de/by-2-0 for LVermGeo open data · checked 24 Oct 2026 |
| Land use | Forest (Wald) (100% of the area, as the cadastre records it) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Location | Saxony-Anhalt | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 52.6550, 10.9480 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | UW Nettgau (1.74 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | Avacon | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Hattorf (34.2 km from the nearest parcel, 380 kV, E.ON Netz GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026 |
| Water stress | Medium to high (20–40%) (score 2.9 of 5, withdrawals 36% of renewable supply) | WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026 |
How it compares
#115 of 256 sites in Saxony-Anhalt and #2,455 of 4,863 in Germany by site score. Larger than 85% of the sites in Saxony-Anhalt. Closer to its substation than 14% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 130 ha | 35 | 35 |
| Distance to the substation | 1.74 km | 4.6 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 50 | 100 |
How the site score works in Germany · Search sites in Saxony-Anhalt
Nearby sites on the same substation
2 other sites have UW Nettgau as nearest substation and would compete for its capacity.
- 58 ha site at Gemarkung Nettgau, Flur 5, Flurstück 510 km · score 63
- 309 ha site at Gemarkung Lüdelsen, Flur 3, Flurstück 5/1181.06 km · score 61
- Sites in Saxony-Anhalt265
- Sites in Germany5,000
- UW Nettgausubstation
Data on this page
- © GeoBasis-DE/LVermGeo ST. ALKIS Sachsen-Anhalt (open cadastre), dl-de/by-2-0 for LVermGeo open data.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.
- Kuzma, S., M.F.P. Bierkens, S. Lakshman, T. Luo, L. Saccoccia, E. H. Sutanudjaja, and R. Van Beek. 2023. Aqueduct 4.0: Updated Decision-Relevant Global Water Risk Indicators. Technical Note. Washington, DC: World Resources Institute. doi.org/10.46830/writn.23.00061. WRI Aqueduct 4.0, CC BY 4.0.