Powered land · North Rhine-Westphalia

81 ha site at Gemarkung Herbeck, Flur 3, Flurstück 116

A candidate site of 81.3 ha in North Rhine-Westphalia, made up of 1 cadastral parcel, mostly open-cast mine or quarry. It touches the 110 kV substation Donnerkuhle (Enervie Vernetzt GmbH): most such sites are the station's own land. The nearest transmission substation, Garenfeld (220 kV), is 4.5 km away, where the grid development plan lists 2 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area81.3 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Herbeck, Flur 3, Flurstück 116)ALKIS Nordrhein-Westfalen (open cadastre) · dl-de/zero-2-0 · checked 24 Oct 2026
Land useOpen-cast mine or quarry (Tagebau, Grube, Steinbruch) (67% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationNorth Rhine-WestphaliaRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates51.3613, 7.5255 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationDonnerkuhle (0 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorEnervie Vernetzt GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationGarenfeld (4.5 km from the nearest parcel, 220 kV, Enervie Vernetzt GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substationMSCDN (1x) (due 2030); Short-circuit strength upgrade (due 2037) (Netzentwicklungsplan)Netzentwicklungsplan Strom: digital project library · record · CC BY 4.0 · checked 24 Oct 2026

How it compares

Ranked apart: it touches its substation, and most sites that do are the station's own land. Its score would be 72.

PartThis sitePointsOf
Area81.3 ha26.735
Distance to the substation0 km3535
Substation voltage110 kV1030
Site score72100

How the site score works in Germany · Search sites in North Rhine-Westphalia

Data on this page